How Heat Pumps Work: Efficient Heating Explained

Mark Fitzpatrick • July 12, 2024

Extract Heat from Cold 

A newspaper recently reported on a video, widely viewed on the internet. Hilarity erupted worldwide from a young person who listed things she did not understand. Why she asked was the number 11 not pronounced ‘onety one’ as is 22 (twenty two) , 33 (thirty three ) and so on. She also asked who had invented electricity and why was it windy outdoors? As far as she was concerned things just happened because they did.


Perhaps it’s worth pointing out that electricity was discovered not invented, but how many people can describe electrical generation and distribution in detail?


An even bigger mystery commonly brushed under the proverbial carpet, is how heat can be created from cold objects. The first point rather like the inventor of electricity question is understanding, heat is extracted from cold objects not created. Once you are on board with this it all becomes clear. 


What is cold? 

Zero degrees centigrade 0oC is normally considered as cold as it is the point water turns to ice. How can you take heat from something, literally, freezing cold? The human body is usually 37oC and a pleasant day is 30oC. So, it seems right, zero is cold. 


According to the boffins, in this galaxy, temperatures range from plus 6,000oC on the sun’s surface down to parts of space close to minus 273oC. This is known as absolute zero and is measured as zero degrees Kelvin(0oK).


For our purposes, anything warmer than -273o has some heat stored within it and our job is to get it out and use it as a green form of energy. The point to be grasped is, there is a lot of stored heat in objects, we consider to be cold. 


This heat extraction is carried out by heat pumps which take heat from air, from water in rivers or ponds or under the ground’s surface by boreholes or trenches. This heat is delivered to wherever you want it. We consider heat pumps to be green because they harness a renewable form of energy and getting this working requires a lot less energy than is extracted. 


Many people explain heat pumps by comparing them to refrigerators – in reverse. This analogy is more useful to people who already understand how refrigerators work and may well not need the explanation. However, everyone has witnessed warmish objects becoming colder after being placed inside a refrigerator. They become colder because the heat in the object is sucked out and dispelled. To avoid overheating, the refrigerator is ventilated and the heat dispersed. If it had started as a colder object placed in a unit and heat taken and recycled to wherever it is needed, then this by definition is a heat pump. 


To install a heat pump as part of your heating system does not mean you must understand all the intricacies of how it works in the same way you do not need to be a mechanic to drive a car. The basic ins and outs of various engines gives you an overview and if you decide to go for electric battery power over petrol or diesel engines, you understand why you made the choice. 


The same thinking applies to heat pumps. They are all described by what they do. How do they take their power and where do they send it to? They may take heat from air and distribute it by water through radiators or extract heat from air and distribute it through grilles. These systems are described as air to air or air to water. Alternatively, they may take heat from a ground source and distribute it through air or water. This is termed water to air or water to water. 

What is co-efficient of performance (CoP)? 

The CoP is the measure of return of efficiency of the overall system. You will be looking for the lowest spend or the highest amount of energy for the least amount of initial electricity. Which system configuration gives you the greatest return?


You will probably instinctively sense how you want it distributed or what you feel comfortable with (air or water) and you will want the most efficient access to the source. You should seek professional advice from a consultant or design and install contractor but understanding the basics does help. 


A point to consider is how we power the heat pump. To extract heat, we need electrical power and is this power generated by green methods? The green credentials of this electricity is determined by the origin of the generating fuel. Often, we use non-green power to extract green power. Unless you are self-sufficient and off-grid there is not much you can do as an individual on this front.


When you determine what the options are between initial outgoing costs, ongoing costs and your level of return your decisions are made easier. 


I am not sure we got anywhere near answering the question of the naming of number 11, or why it is windy at the local park but we can’t have everything. 

Why not give Fitzpatrick Team a call to help with your commercial build?

By Mark Fitzpatrick February 19, 2026
Who Made the Team? Before you start anything at all, you decide you want to construct a new building or refurbish/ extend an existing building. From that point you usually commence in one of two ways : As client, you discuss the proposed construction work with a couple of designers to see who gels and who you could come to trust. One designer is appointed as team leader (contract administrator), layout and elevations are proposed, approved and fixed. You are aware of a builder who can do the type of job you know you want and they arrange a special design for you or they offer a standard building from their catalogue. Layouts and elevations are proposed, approved and fixed. Some clients initially prefer to appoint a Project Manager but this is relatively rare. For both 1 & 2 before submission to the planning authorities, you may need input from other consultants, perhaps not. After permission to commence work is granted, you appoint other specialist consultants who overlay their designs onto the fixed and approved scheme. What will probably occur. You will for example, engage a consultant structural engineer who will have opinions on an appropriate structure for the house. They will have considered previous land uses, adjacent trees, plants and site conditions, tested the soil type and considered the dead and live loads you are imposing. They will have looked at the layout and thought through issues leading them to conclude on a recommended foundation. The team will continue this process for each structural element of the walls, floors and roof and manufactured components such as windows, doors, and services such as heating & cooling etc. The team will complete the design to meet current regulations and this is a lot to take in and question. If you have concerns and wish to bring them forward for inclusion in the design process, then you are leaving it too late if you only know what is planned on completion by reading their drawings. For you to have an input you will need to have engaged with all the team members earlier and kept up with the design deliberations. This does not normally occur as clients do not usually have this much detailed input. Its more that you employ specialists and they bring their specifications forward in isolation. The danger in this approach is that consultants only design within their specialism. They add to what went before. They do not offer innovation, as they have pre-set guidelines to work within. Fitzpatrick Team look at things differently. We propose that the members of the consultant’s team should not work separately and just bring their expertise individually to bear on the pre-fixed proposal. They should from the beginning feel that they are in a partnership to produce the best overall solution that they can. By the specialist consultant’s early involvement, they influence choices available and selections made. Not only does their input include valuable insights and joined up technologies it also allows items that seem obvious and costly to be omitted or made redundant. The selection of one technology negates or reduces the size of another. This can produce an energy-saving design and reduce costs. The concept of how the team will operate is an excellent starting point in the earliest conversations. Discussion should include your vision for your business, and your take on sustainable design. By raising these points early in preliminary meetings, you are setting the scene for a collaborative or ‘integrative’ approach. Fitzpatrick Team are very focussed on leading the right team to deliver what you want, not what complies with a distant and out of touch regulation. Give Mark a call to discuss your project.
Melbourne Demolition and Construction Sites.
By Mark Fitzpatrick February 19, 2026
Do I need a hoarding or a security fence? In Melbourne all demolition works require secure fencing to protect passers-by and restrict access. This is invariably a temporary fence erected for the duration of the works. If the boundary is beside a public throughfare it can only be a wire security fence if the distance from the structure is more than the measurement of twice the height of the existing building. Otherwise, it must be a solid hoarding. How high should hoardings be? Australian standards call for perimeter security fences/hoardings to all building and demolition sites. The minimum height is set at 1.8m high above an adjacent public throughfare. The three most popular security fences are:- Solid Timber Solid timber hoardings are constructed by concreting large robust timber posts into the ground and fitting timber runners between. Bracing may be added for extra stability. Sheets of ply are fixed to the timber structure facing out of the site to the public area. They are often 2.4 m high as the lower minimum of 1.8m is often considered a little modest. Sheets of ply are produced at a standard 2.4 x 1.2m and this has become the default height of typical hoardings. In order to increase their aesthetic appearance, a skirting/plinth or a frame is often fixed to the external face edges. The hoarding is painted and signage fixed to the face with public warnings and information. In order to impress potential purchasers/customers or because of the prestige of the building behind hoardings are often ‘wrapped’ in a plastic sheeting with high quality images or signs. Solid Steel Solid steel is used where a solid hoarding is required but it does not have to be as robust as a timber post ply hoarding. The factory formed panels are all made to standard sizes and pre-painted. They are supported by purpose made concrete or weighted plastic feet. They are placed on the ground and do not need to be secured down as they rely on self-weight. They are coupled together laterally by connectors that are manufactured as part of the kit. Standard size gates can be included in the package. Signage can be fixed to the face of the solid panels. Wire Panel Wire panel fences are similar to solid steel although obviously they are wire with openings. They can be left as a finished product or often netting is fixed to the panels still allowing vision from external areas but stopping items protruding through the fence. The netting can be printed with information or warnings. These kits can be purchased outright or hired for the works duration. One benefit of the solid steel or wire panels is that they are speedily demountable and moveable whereas the timber fencing is static. Should Hoardings be lit in Melbourne? On Melbourne demolition sites lighting should be provided so that operations and obstructions are clearly visible. Basically, we want to protect any person working on site or passing by. So, if lighting inside the assists, then provide lighting. If lighting the hoarding prevents people or vehicles colliding with the hoarding then light the hoarding. This will be determined by an on-site risk assessment. Construction sites are similar but other concerns are also raised. It may also be a consideration that security lighting reduces the likelihood of unauthorised entry. As part of our hazard identification and site risk assessment procedure, we assess what protections and security should be in place. Give us a call to discuss risk management and protection. Do Hoardings Have to be Designed by an Engineer in Melbourne You can only erect hoardings with the land owner’s approval. Permission from a private owner can be either formal or informal. If the owner is a council or public body this is always ultra-formal and detailed authorisation is necessary. They sometimes publish application requirements on their websites and you need to follow their conditions to the letter. When you progress into discussion, they often ask you to supply structural calculations from an engineer for the hoarding to demonstrate that it will be stable. They will more than likely ask for design drawings, work plans, details of plant and tools, certificates of insurances, traffic management plans, health and safety documents etc. This leads to a formal agreement between you and the authority. Fitzpatrick’s are well versed in these negotiations and the compilation of fully compliant documentation. Give Mark a call and we can take over this for you!
By Brandon Caspersz February 19, 2026
When do you need overhead protection in Melbourne? If your Melbourne building has a street frontage or is close to it and the structure height exceeds 4.0m, you need overhead protection to safeguard members of the public. This mostly affects shops and offices you walk directly into from a public footpath. What protection must be provided? Protection is normally provided by a ‘special duty scaffold’ which by design structurally supports universally distributed live loads. It must also be designed to deflect any demolished materials back onto the scaffold and not into the public area. It is not a case of just asking that this be done – calculations, designs, safety documents etc are all required to meet building regulations. Scaffolding as overhead protection is regulated and must be in line with: AS 2601 – 2001. AS 1576 AS 1577 AS/NZS 4576 Call Fitzpatrick Team to get this right first time.
By Mark Fitzpatrick February 19, 2026
All workers and visitors to Melbourne construction sites must dress in approved safety wear and helmets. Workers must also wear approved personal protective clothing and carry personal protective equipment (PPE). The Magnificent Seven PCBU - Person Conducting a Business or Undertaking How far can the blame be spread? Construction sites can be dangerous workplaces and the essential safety workwear and PPE to keep all our workers and visitors safe should be used by all who attend your construction site. It is morally imperative that all workers, visitors and passers-by are kept safe and sound and it is a corporate responsibility that sufficient equipment is available. Precautions must be in place to ensure that not only are safe working practices carefully followed but that behaviour matches the aspiration. The Person Conducting a Business or Undertaking (PCBU) must provide sufficient resources to ensure that all contractors and operatives are fully funded to employ safe working methods. This is a catchall that covers the client as well as the builder. Q. If it all goes horribly wrong how far can the blame be spread? A. The blame can be spread far and wide and it is best avoided by taking care on how things are set up in the first place. The builder and client should work together to keep your work-site safe. The Magnificent Seven Checklist Hard hats are required to be worn by all people entering the worksite to protect them from something dropping onto their head or their heads colliding with low lying projecting object (such as a scaffold pole). AS/NZS 1801. Safety footwear protects your feet from being crushed by materials or people. AS/NZS 2210.1 and AS/NZS 2210.2 Safety gloves or mittens to protect your skin from hazardous materials or from rough surfaces or splinters. AS/NZS 2161. Hearing protection shields ears and your senses from loud noise preventing hearing loss. AS 1270. Safety glasses or eye protectors to protect your eyes from dust and dirt. AS1336 and 1337 Industrial safety belts or harnesses to provide a lifeline for people working at height. AS/NZS 1891. (all parts) Reflective clothing (Hi Viz) to make you more visible to others. Clothing should provide body protection and guard the wearer from scuffs and bruises. Bare skin on legs and arms should be protected from sun damage which leads to skin irritation and cancers. The magnificent seven are a great place to start in setting your goals for a safe workplace. Fitzpatrick’s use this checklist to ensure that all people are kept safe whether they are a visitor or on site worker. But this list is only the start, we have systems in place to keep our worksite safe. Give Mark a call and demand a safe working environment for your building works.
Gym Fitout
By DBF Melbourne May 7, 2025
Elevate your Brighton gym with DBF Melbourne. We deliver luxury fitouts that attract and retain premium fitness clients.
By Mark Fitzpatrick April 28, 2025
While Australia's two biggest property markets continue to slow, some smaller markets are starting to post stronger growth.(ABC News: Ian Cutmore) Melbourne property prices have passed Sydney as the nation's fastest growing, although they still lagged well behind in terms of absolute cost.
By Mark Fitzpatrick April 28, 2025
Transform your financial office with DBF Melbourne. We deliver secure, compliant, and client-focused fitouts across Victoria.
Bar Fitout
By Mark Fitzpatrick April 22, 2025
Design your dream cocktail bar in Mordialloc with DBF Melbourne. Discover key design tips, functionality advice, and expert local construction support
A group of people are sitting at desks in an office.
By Mark Fitzpatrick April 7, 2025
Create a productive office in Dandenong with DBF Melbourne. We deliver tailored fitout solutions that boost functionality and team collaboration.
Residential Demolition
By Mark Fitzpatrick April 1, 2025
Elevate your Brighton gym with DBF Melbourne. We create luxurious fitouts that attract and retain high-end fitness clients.
More Posts